Project Name

Turkmenistan Block 1 Gas Development Project

Phase Secant Pile for Whalf Zone 1&Zone 3

   
Location Kiyanly /Turkmenbashi, Turkmenistan
Client / Contractor MMHE / PCTSB - Petronas Carigali Turkmenistan Sdn. Bhd. 
Scope of Work

 

Procurement, construction and commissioning  of 105 no’s secondary piles. Average length of each  pile is 15.00 meters and 800 mm diameters. After the installation and pouring of concrete, piles will be cut by means of  providing 700 mm distance from one axes to another axes. It means, both primary and secondary piles will be constructed.While drilling operation, in case of probability fall down of soil layers, bentonit materials will be applied to avoid of it. At the same time, also reinforcement which has already been prepared, it should be have been installed. Afterward, pile caps will be cut approximately 60-70 cm and re-bar installation will be done on the top.

   
Project Duration 2011 - Ongoing